Naia Lagoons
Owner (Client):
Naia Development
Main Contractor:
Perfect for Engineering & Constructions
Consultant:
Crystal Lagoons / UGCE / MITO
Crystal Lagoons has perfected the art of creating unlimited size turquoise lagoons worldwide using its own technology, this technology’s extraordinary advantages, low construction and maintenance costs, and sustainable properties have allowed Crystal Lagoons to have more than 1,000 projects in more than 60 countries worldwide
Project Type:
Infrastructure & Lagoons
Project Duration:
Start date: 16/2/2025
Completion date: 16/2/2026
Location:
Swan Lake, North Coast, Egypt
Scope of Work:
Turnkey Project including Civil, Mechanical and Electrical Works:
Civil Works:
• Earth Works ( Excavation , Backfilling , Beach Crystal Sand , … etc)
• Builder and Concrete works ( Beach egdes , Walls , Machime Rooms , Chambers , Beams , .. etc)
• Structure Steel works
• Water Proofing (liner, Geocomposite, Polylocks , …etc )
• Finishing works.
Lagoon Systems:
• Bottom Cleaning System
• Nozzle System
• ORP System
• Additive Dosing system & Monitoring
• Operational Element Hydraulic Cleaning
• Beach Dosing system
• Filtration System
• Back Wash System
• Recirculation System
• Bottom Cleaning System
• Replenishment water system
• Clarified Water System.
• Air Compressor System
• Skimmer system
Mechanical Systems:
• Fire Fighting System
• Ventilation system
• Plumbing system (Domestic Water system, Drainage system , ..etc)
Electrical Systems:
• Low Voltage Cables and feeders
• Low Voltage Main and sub-main Distribution Boards
• Fiber Optic System
• Earthing System
• Lighting , Power Systems
Key Features:
- Experience of specialized systems of lagoons
Visual Gallery:
Mountain View Lagoons
Client:
Mountain View
Main Contractor (Client):
Perfect for Engineering & Constructions
Perfect has proved experience and quality in implementing crystal lagoon projects, therefore perfect name was added to approve short list of crystal lagoons in Egypt.
Consultant:
Crystal Lagoons / DMA
Crystal Lagoons has perfected the art of creating unlimited size turquoise lagoons worldwide using its own technology, this technology’s extraordinary advantages, low construction and maintenance costs, and sustainable properties have allowed Crystal Lagoons to have more than 1,000 projects in more than 60 countries worldwide
Project Type:
Infrastructure & Lagoons
Project Duration:
Start date: April 2024
Completion date: Expected in December 2025
Location:
Mountain View, Ras El Hekma , North Coast, Egypt
Scope of Work:
Turnkey Project including Civil, Mechanical and Electrical Works:
Civil Works:
- Earth Works ( Excavation , Backfilling , Beach Crystal Sand , … etc)
- Builder and Concrete works ( Beach egdes , Walls , Machime Rooms , Chambers , Beams , .. etc)
- Structure Steel works
- Water Proofing (liner, Geocomposite, Polylocks , …etc )
- Finishing works
Lagoon Systems:
- Bottom Cleaning System
- Nozzle System
- ORP System
- Additive Dosing system & Monitoring
- Operational Element Hydraulic Cleaning
- Beach Dosing system
- Filtration System
- Back Wash System
- Recirculation System
- Bottom Cleaning System
- Replenishment water system
- Clarified Water System
- Air Compressor System
- Skimmer system
Mechanical Systems:
- Fire Fighting System
- Ventilation system
- Plumbing system (Domestic Water system, Drainage system , ..etc)
Electrical Works:
- Low Voltage Cables and feeders
- Low Voltage Main and sub-main Distribution Boards
- Fiber Optic System
- Earthing System
- Lighting , Power Systems
Key Features:
Experience of specialized systems of lagoons
Challenges & Achievements:
Limited time duration to implement the project.
Visual Gallery:
Swan Lake Lagoons
Client:
Hassan Allam Properties
Main Contractor:
Hassan Allam Constructions
Consultant:
Crystal Lagoons
Crystal Lagoons has perfected the art of creating unlimited size turquoise lagoons worldwide using its own technology, this technology’s extraordinary advantages, low construction and maintenance costs, and sustainable properties have allowed Crystal Lagoons to have more than 1,000 projects in more than 60 countries worldwide.
Project Type:
Crystal Lagoons
Project Duration:
Start date: 4/12/2019
Completion date: 31/8/2023
Location:
Swan Lake, North Coast, Egypt
Scope of Work:
Electro-Mechanical Infrastructure Networks:
Electrical Works:
- Low Voltage Cables , Panels , Outdoor Lighting systems, Utility Buildings , …etc
Mechanical Works :
- Fire Fighting Network
- Plumbing Network
- Irrigation Network
- Heating , Ventilation & Air Conditioning Systems