Skip to Content

Aquatic Center sport city


Client: 

Armed Forces Engineering Authority


Main Contractor: 

Gama Constructions


Consultant: 

ECG: ( Engineering Consulting Group )


Project Type: 

Cosmos.

Project Duration: 

Start date:    22/11/2020

Completion date:  Expected in   26/5/2024

Location: 

New Capital City, Egypt 


Scope of Work:

Mechanical Works:

  • Fire Fighting Systems
  • Heating, Ventilation, and Air Conditioning (HVAC Systems).


Key Features:

  • High international standards and specifications



Visual Gallery:


Image 1 Image 2 Image 3


Ministrial Buildings


Client

Armed Forces Engineering Authority


Main Contractor: 

Gama Construction

Consultant: 

Dar Elhandasa

Project Type: 

Infrastructure

Project Duration: 

Start date:     28/8/2019

Completion date:  Expected in  25/6/2021


 Location: 

  New Administrative Capital City, Egypt

 

Scope of Work:

   Electro-Mechanical Infrastructure Networks:


Electrical Works :

   • Low Voltage Cables , Panels , Outdoor Lighting systems, Utility Buildings , …etc


Mechanical Works :

  • Fire Fighting Network
  • Plumbing Network
  • Irrigation Network 
  • Heating , Ventilation & Air Conditioning Systems



Visual Gallery:


Image 1 Image 2 Image 3