IFF Factory


Client:

Misr Co. For Aromatic Products – MARP (Division of IFF).

Main Contractor:

Perfect For Engineering & Construction

Consultant:

Innovafood Consultancy

Project Type: 

Industrial

Project Duration:

Start date: 15/7/2024

Expected Completion date: 31/12/2025

Location:

6th October City, Egypt

Scope of Work:

Civil Works:

  • Skeleton Works including ( Excavation & filling works , Piles , concrete , steel structure , … etc)
  • Finishes work including ( Masonry , Doors , Windows , Flooring , Paintings …etc)

Mechanical Systems:

  • Heating , Ventilation and Air conditioning systems
  • Plumbing Systems

Electrical Systems:

  • Low Voltage systems ( Lighting , Power , Cabling , Earthing , ….etc )
  • Light Current Systems ( Data Systems , Camera System , Public Address ,

         …. etc )

Challenges & Achievements:

  • High safety standards
  • Construction while the factory in process.
  • Hygiene standards
  • High specifications & standards

Visual Gallery:


Image 1 Image 2 Image 3


Juhina Warehouse


Owner:

Juhayna

Main Contractor (Client):

Hysec

Consultant:

Howeedy

Project Type:

Industrial

Project Duration:

Start date: 12/10/2024

Expected Completion date: 30/8/2025

Location:

6th October City, Giza, Egypt 

Scope of Work:

Mechanical Systems:

  •  Heating , Ventilation and Air conditioning systems

  •  Plumbing Systems

  •  Fire Fighting Systems

Electrical  Systems:

 •  Low Voltage systems ( Lighting , Power , Panels , Transformers ,  Cabling , Earthing , ….etc )

 •  Light Current Systems ( Data Systems , Fire alarm system , CCTV System ,  …. etc )

Visual Gallery:



Image 1 Image 2 Image 3


Corona Factory


Client: 

Hysec

The Project includes supply & Apply Electromechanical systems for 40 units (Villas & Chalets), civil works scope is through sister company (HYSEC).

Main Contractor: 

Hysec

Consultant: 

EHAF / MITO

Project Type: 

Residential & Commercial

Project Duration: 

Start date:   7/5/2024

Completion date:  Expected in   30/12/2025

Location: 

 Masyaf- Ras El-Hekma, North Coast , Egypt

Scope of Work:


Mechanical Systems:

  • Heating , Ventilation and Air conditioning systems
  • Plumbing Systems

Electrical Systems:

  • Low Voltage systems ( Lighting , Power , Cabling , Earthing , ….etc )
  • Light Current Systems ( Data Systems , TV System ,  …. etc )

Challenges & Achievements:

  • Fast Track Project

Visual Gallery:


Image 1 Image 2 Image 3


Galila Factory


Client:   

Gelila Factory

Gelila is a family company exporting high-quality fresh fruits and vegetables worldwide since 1985.


Main Contractor: 

United Engineering & Construction


Project Management: 

ACE Moharram.Bakhoum​


Consultant:  

S.A.F.


Project Type:

Food Industry


Project Duration: 

Start date:  17/3/2019

Completion date:  15/11/2022


Location: 

 Sadat City - Monufia Governorate, Egypt


Scope of Work:


Mechanical Systems:

  • Fire Fighting Systems
  • Heating, Ventilation, and Air Conditioning (HVAC Systems)
  • Plumbing Systems

Electrical Systems:

  • Medium Voltage Systems (Transformers – M.V. Switch Gear – etc..)
  • Low Voltage Systems ( Generators , Panel Boards , Lighting , Power , Cables , Earthing , … etc )
  • Light Current Systems (Camera System, Data Network, Fire alarm System, etc..)



Key Features: 

  • Hygiene standards



Visual Gallery:

Image 1 Image 2 Image 3



Jotun Factory


Client:

 El Mohandes Jotun S.A.E

Main Contractor:

Hassan Allam Construction

Consultant:

COSMOS-E Engineers & Consultants ​


Project Type: 

Industrial

Project Duration: 

Start date: 14/10/2021

Completion date: 30/11/2023

Location:

10th of Ramadan, Egypt

Scope of Work:

Mechanical Works:

  • Fire Fighting System
  • Heating , Ventilation and Air conditioning systems​

Visual Gallery:


Image 1 Image 2 Image 3


Soap Noodles factory


Client: 

 IFFCO ​

Main Contractor: 

Perfect For Engineering & Construction ​

Consultant: 

ECE

Project Type: 

Industrial ​

Project Duration: 

Start date: 30/11/2021

Completion date: 30/11/2022

Location: 

Suez, Egypt ​

Scope of Work:

Mechanical Systems:

  • Fire Fighting System
  • Heating , Ventilation and Air conditioning systems
  • Plumbing Systems 
  • Steam System

Electrical Systems:

  • Machine Installation including instrumentation and control panels 
  • Low Volatage systems ( Lighting , Power , Cabling , Earthing , etc )
  • Light Current Systems ( Data Systems , Camera System , Fire Alarm System ,  etc )​

Visual Gallery: